Overview

VKL Builders brings you an extraordinary home at the most sought after place in the city at Sreekaryam. Known as the educational hub of the city with the university headquarters and Loyola group of educational institutions, VKL Gardens places you in the heart of the city with excellent connectivity to all urban conveniences. The 2&3 bedroom apartments have luminous natural light to brighten up your days and clean, green surroundings that make it an idyllic neighbourhood.

VKL Gardens orchestrates all finer aspects of community living. The stunning architecture complimented with luxurious amenities facilitates a classy lifestyle. The tranquility of the location doesn’t deprive you the indulgence of being in the middle of every happening thing. Large landscaped area, a plush lobby with an inviting ambience and thoughtfully provided amenities lent you haven of peace and sophistication.

Quick Facts

  • Location:Near Sreekaryam (Kariyam Junction)

  • Type:Premium Apartments

  • Land Area:1.05 Acres

  • Units:128 Apartments of 2&3 Bedrooms

  • No. of floors:G+ 11 Floors

Specifications

Vitrified Flooring

60 X 60cm for apartment, main staircase, lobby and passage.

Kitchen

Platform done in quality granite with double bowl single drain sink, 60cm dado above granite counter. Hot water provision for kitchen sink.

Toilets

Toilet walls with ceramic tiles up to false ceiling, premium quality CP fittings Jaquar/Cera or equivalent. Single lever diverters with shower in all toilets. Single lever basin. Wall hung sanitary fixtures with concealed cistern in all toilets.

Doors and Windows

Elegant teak wood for entrance door. Partially glazed flush doors for kitchen. Flush door with water resistant coating inside for toilets doors. Fully glazed UPVC sliding door for living balcony. Powder coated aluminium windows with safety grills.

Painting

Putty and plastic emulsion for internal walls & ceiling, weather coat emulsion outside.

Electrical

Concealed conduit wiring with copper conductor, adequate light and fan points, 6/16 amps socket points etc, controlled by ELCB and MCB’s with independent KSEB meter.

Lifts

4 nos automated passenger lift & 2 nos service lift.

Telephone

Telephone point provisions in living and bedrooms.

TV Point

TV point in living and bedrooms.

Fire Fighting

As per NBC norms.

Generator

Back up for common area and lifts. Apartments would have a back up limited to the load of 500W covering light, fan in all rooms.

Sewage Treatment Plant

Waste Management System.

Amenities

  • Elegant facade with stone cladding and waterbody.
  • Plush air-conditioned entrance lounge on the Ground floor.
  • Fully air conditioned Association office & Meeting room.
  • Covered swimming pool on 1st floor with separate changing room for Ladies & Gents.
  • Fully equipped unisex gymnasium on the first floor.
  • Two fully furnished Guest Suites on the first floor.
  • Tastefully designed spacious club house on the first floor.
  • Convenience store on the ground floor.
  • DTH/Cable TV internet, provisions in living and bedrooms.
  • Provision for split AC’s in living and bedrooms.
  • Rain water harvesting.
  • Common area lighting powered by solar power.
  • Roof top covered play area.
  • Kids play area.
  • Visitors car parking.
  • Drivers dormitory.
  • Intercom facility.

Key Plans

Unit Plans

Location Map

  • Karyavattom Campus – 6.2 kms
  • Technopark – 8.0 kms
  • Airport – 11 kms
  • City – 5.0 kms
  • Kochuveli Railway Station – 8.0 kms
  • Medical college – 5.0 kms
  • Pothencode – 9.7 kms
  • Loyola School – 2.8 kms
  • CET – 3.3 kms
  • Sreekaryam Jn – 1.7 kms

Construction Updates

Work in progress as on April 2016

Work in progress as on March 2016

Work in progress as on February 2016

Work in progress as on January 2016

Work in progress as on December 2015

Work in progress as on November 2015

Work in progress as on October 2015

Work in progress as on September 2015

Work in progress as on August 2015

Work in progress as on July 2015

Work in progress as on June 2015

Work in progress as on May 2015

Work in progress as on March 2015

Work in progress as on February 2015

Work in progress as on January 2015

Work in progress as on December 2014

Work in progress as on November 2014

Work in progress as on October 2014

Newsletter

Read our blog :

www.vklbuilders.com/blog

Enquire
Now